Case Study

Pemex

LOCATION

Gulf of Mexico

PROJECT VALUE

$29,000,000 USD

PROJECT TIMELINE

18 months

TYPE OF EQUIPMENT

Oil Production Topsides

PRODUCTION CAPACITY

20,000 BPD

SCHEDULE

Delivered on schedule

SAFETY

No lost time accidents

PROJECT DESCRIPTION

Drakken personnel provided project and construction management support for the FPSO ECOIII. The ECOIII was a DP2 designated well test service vessel (WTSV) destined for operation in Pemex’s operating fields offshore Campeche, Mexico. The converted vessel was added to an existing fleet of support vessels, operated by Maritima Ecologia S.A. (Marecsa) under contract to Pemex. Pemex’s offshore operations produce in excess of 2M barrels of crude per day. The process topsides aboard the vessel had to be multi-functional with the ability to not only receive drilling formation fluids and HCl acid for cleanup, dilution and subsequent disposal, but also process testing and measurement of gas (sweet and sour), oil ranging from 10° to 45° API, the associated produced water, and handling formation sediments (solids) at various flowing conditions. A similar vessel was constructed in 2003, and demonstrated the feasibility of a dynamic well test service vessel in Pemex’s operating field. Drakken personnel played a key role in the fabrication of the vessel topsides, managing all mechanical, process and electrical instrumentation and automation for the project. This turnkey project included project management, design, procurement, fabrication, field construction and commissioning services. The purchase order value for the scope of Drakken personnel management on the project was over $25M.

← Back to Case Studies